Construction of the Shiraldzhin concentrating plant with a capacity of 500 thousand tons/year
Metals: Au
Year: 2015, 2017-2018
Country: Kyrgyzstan
RESEARCH. Technological regulations were developed for design of gold recovery plant for processing ore from the Shiraldzhin deposit to produce gold in “Dore” alloy.
DESIGN. The working project of the Shiraldzhin beneficiation plant with infrastructure facilities and tailings facilities was developed. A positive conclusion of the state expert examination of the Republic of Kyrgyzstan was received in 2018.
Reconstruction of the “Nurkazgan” beneficiation plant with output of 4.0 million tons per year.
Read more