Technical re-equipment of the Rubtsovskaya processing plant without stopping production.
Metals: Pb, Zn, Cu
Year: 2018-2020
Country Russia
RESEARCH. Based on the conducted technological and mineralogical studies, a highly efficient technology for beneficiation polymetallic ore from the Korbalikha deposit was developed.
DESIGN. The project of reconstruction without stopping the technological process provides for increase in capacity of the plant to 1.5 million tons of ore per year.
A positive conclusion of the state expertise on the project of reconstruction of the Rubtsovskaya beneficiation plant (“Sibir-Polymetals” OJSC) was received
EQUIPMENT. RIF flotation machines with capacity of 3.5 m3, 8.5 m3 and 16 m3 with automation systems were delivered.