Construction of the Mining and Metallurgical Plant MMP-4 with a capacity of 1.8 million tons of ore per year.

Metals: Au
Year: 2010-2011
Country: Uzbekistan

RESEARCH. The studies on the development of optimum technologies of processing of gold ore deposit “Charmitan” on all the key production stages were performed, the results of the work previously performed by other companies and research institutions were summarized.

In the conditions of the pilot production laboratory, the RIVS specialists together with the specialists of SE NMMC performed semi-industrial tests that confirmed the results of laboratory studies.

DESIGN. The RIVS Company served as the General designer. The technological regulations and working documentation of the processing complex with a capacity of 1.8 million tons per year were developed. To speed up implementation of the project, permission was obtained for the parallel design and construction of the complex.

EQUIPMENT. The equipment was delivered on a turnkey basis.