Raw material: phosphate
Year: 2002-2016
Country: Russia
RESEARCH. A full audit of the ANOF-3 operation was carried out with recommendations for improving technological indicators and reducing the cost of processing mineral raw materials at ANOF-3
DESIGN. Technical documentation was developed for installation of magnetic separators in KPNK ANOF-2 for removal of aegirine from nepheline concentrate. Documentation was developed for changing the storage flows of different-quality products of the ANOF-2 nepheline production in silos.
EQUIPMENT. RIF contact tanks were delivered. ANOF-3 flotation section was upgraded.
Construction of a beneficiation plant for processing gold-copper-zinc and gold-quartz ores with a capacity of 900 thousand tons of ore per year
Read more